More than Design-Bid-Build: Alternative Construction Delivery Methods

BY MIKE TOUSLEY, Executive Vice President & General Manager, The Weitz Company

In the construction industry, there are more ways to build a project than the traditional design-bid-build delivery method, in which projects are awarded to the lowest bidder. Projects carried out in this way do not always result in the most time and money saved or with the highest level of quality workmanship in the final product.

In this post, Andy Gardner, our Preconstruction Director, joins me in defining alternative project delivery methods and how these methods affect construction projects.

Traditional versus alternative

The traditional project method stems from a competitive process in which contractors take a completed set of construction documents and provide a cost for construction, according to bids received from subcontractors for the different building elements. More often than not, the lowest responsible bidder wins. This is the traditional method with most public entities, though private groups will often use alternative project delivery methods.

We prefer alternative delivery methods because the selection of the contractor is based on more qualifications than solely being the lowest bidder on the project. The size of the project, and a company’s relevant project experience, the experience of its staff and its safety record are just a few of the additional decision-making factors when using project delivery methods alternative to traditional design-bid-build.

We are very selective when deciding to pursue a project that will be awarded solely on being the lowest cost. Because this delivery method is based on having the lowest price on bid day, this delivery method has a history of being more litigious than other methods.

Alternative methods have their advantages and disadvantages, though they are preferred by private entities because of the chemistry established between the parties involved and the team-like atmosphere to work toward a common solution.

Through alternative delivery methods, we are able to meet with a customer early in the project development process to learn the driving forces behind their project and educate them on their project delivery options, so they can pick the one that is most appropriate for them and their business. In the end, we typically save the customer time and money because of the collaboration amongst all team members toward meeting the client’s goals.

Often, these methods use a process of proposal submission (which can include a qualifications proposal in addition to a pricing proposal) and an interview conducted by the customer with the proposed project team.

Weighing the pros and cons

Andy Gardner: To give a rundown, here are some of the various alternative project delivery methods and the advantages and disadvantages associated with them:

Gardner continues: There are a few distinct differences in each of the methods, but all have the same goal: to cover the entire scope of work as defined by the customer and to produce a product that produces the best value to the customer by balancing cost, schedule and quality goals.

Contact us if you’d like to learn more about alternative construction delivery methods:

Andy Gardner, Preconstruction Director